Data Center Infrastructure

The power, cooling, racks and cabling behind a data hall, designed, supplied, installed and commissioned by one team. For new builds, expansions and relocations of existing facilities.

Rows of white server cabinets in a modern data hall
Scope

Every system in the white space and the plant room.

Power

  • UPS systems and batteries
  • Generators and transfer switches
  • LV switchgear and distribution
  • Rack PDUs and busway

Cooling

  • CRAC and CRAH units
  • Chillers and dry coolers
  • Hot and cold aisle containment
  • Airflow and capacity studies

White space

  • Racks, cabinets and raised floor
  • Structured copper and fiber cabling
  • Overhead cable tray and fiber runners
  • Fire detection and suppression

Monitoring

  • Building management systems
  • Environmental and power monitoring
  • DCIM and asset tracking
  • Access control and video
Starts with
A site assessment and a capacity brief: kW per rack, redundancy level, growth plan
You receive
A commissioned facility with test records, as-built drawings and an asset register
Good fit for
New data halls, expansions, edge sites, high-density compute, and relocating an existing facility
A technician testing equipment in a server rack
Commissioning
Relocation and decommissioning

Move a whole facility, not just the servers.

Decommissioning a data center is a project in its own right, and so is bringing its equipment back to life somewhere else. We audit and value the assets, de-install and pack them with full packing lists, coordinate freight and customs paperwork, then re-install, test and commission at the new site.

  • Asset audit and valuation of UPS, cooling, racks and cabling
  • De-installation, labeling and packing lists per container
  • Freight, export and customs documentation
  • Re-installation, load testing and commissioning
Scope a relocation with us
How a data center project runs

Assess, design, build, commission, hand over.

Capacity and redundancy are set on paper before anything is ordered, and nothing goes live until it has been tested under load.

  1. 1

    Assess

    Survey the site, the power available and the cooling the climate allows. Set the capacity target.

  2. 2

    Design

    Single-line diagrams, cooling layout, rack plan, cabling routes and the redundancy model.

  3. 3

    Build

    Supply and install plant, white space and cabling, with our team on site throughout.

  4. 4

    Commission

    Factory and site acceptance tests, load bank testing and integrated systems testing.

  5. 5

    Hand over

    As-builts, test records, asset register and training for the operations team.

High-density and AI compute

Ready for racks that draw more than the room was built for.

GPU clusters and other high-density deployments change the power and cooling math. We plan the electrical distribution, airflow and containment around the real per-rack load, and design the network fabric to match.

Tier design standardsN+1 / 2N redundancyLoad bank testingIntegrated systems testingHot aisle containmentHigh-density racksGPU cluster fabricSingle-mode fiberBusway distributionDCIM
Next step

Planning a build‑out, a retrofit or a network upgrade?

Tell us about the site and the timeline, and we'll scope the work with you.